Martinez Marina, Westrec Marina Management, Inc., Martinez, California

Mr. Bazley directed the preparation of the marina masterplan that was approved by City Council as the basis for the privatization of the marina and adjacent land areas. Conceptual design work is currently in process to refine the masterplan improvements to accommodate the developers land use plans.

BLUEWater Design Group (BDG) professional services continued with the preparation and processing of the City’s application for grant funding to the California Department of Boating and Waterways (DBW) for improvements to the boat launch ramp and parking areas. The grant to the City was approved by DBW. Design work is currently in process by BDG to prepare construction contract documents for the DBW funded launch ramp improvements.

Similar to the DBW grant, the City was awarded a grant from the California Coastal Conservancy for shoreline stabilization and construction of public plaza and extensive waterfront access improvements. BDG is preparing contract documents for construction of these improvements concurrent with the launch ramp grant improvements. The critical design aspects include creative use of open space and surface treatments and implementation of new technologies for sheet pile construction and lightweight fill (geofoam) to minimize settlement in the deep layers of bay mud at the project site.

BLUEWater Design Group was also responsible for the permitting, design and construction-engineering support services for the year 2000/2001 maintenance dredging of the main channels in the marina. This dredging episode moved 35,000 cubic yards of material to onsite dredge disposal basins.